The adhesive is spread on an area of the subfloor where the boards are going to be adhered to using a specialized trowel.
How to glue down engineered hardwood flooring.
If installing glue down hardwood flooring in a new house completely close the building in with all outside doors and windows in place.
Installing a glue down engineered hardwood floor step 1.
The installation of hardwood floors by the glue down method is used predominately on concrete slabs.
Before applying adhesives you must fill in any voids or deflections in the slab with a cementitious.
Applications are more prominent with residential construction in sunbelt areas commercial locations and high rise dwellings.
Lay spacers along the walls to create the expansion gap specified in the manufacturer s.
When installing these hardwood flooring options you simply slide the tongues into the grooves and place the flooring directly over your subfloor.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low.
The wall coverings and painting should be completed before the installation of the hardwood flooring.
Place the first row.
All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.
Apply the glue to a small area.
Once you have decided to use the glue down floor method make sure that you leave a large enough expansion gap depending on the hardwood product you chose from the wall to allow the wood to contract and expand.
Set the expansion gap.
Typically this type of hardwood flooring is set up with a series of tongues and grooves so that they can be attached to one another.
How to install glue down engineered wood flooring on concrete slab preparation.