This barrier will prevent moisture from.
How to lay used laminate flooring.
It can be installed over any other tightly bonded flooring making it ideal for retrofits.
Installing laminate flooring is a snap literally.
To lay laminate flooring first clear out any furniture in the room you ll be laying the floor in.
Directly onto the subfloor lay down a layer of plastic sheeting to create a moisture barrier.
You ll also want to tear up any carpet in the room and remove the leftover tack strips.
In this video i am showing how to install laminate flooring for the first time.
Install the underlayment or vapor barrier.
If you determine you need to level the floor you can sand the floor and apply a patching compound.
Flooring manufacturers always recommend putting down underlayment before laying the laminate.
Some underlayments come with an attached vapor barrier eliminating the need to lay down two separate products.
This thin dense foam layer helps to absorb sound provides a thermal barrier makes it easier to walk on the laminate and helps the flooring bridge minor gaps and bumps in the underlying floor.
How to install laminate flooring.
A laminate floor is a floating floor meaning it is not fastened directly to the subfloor.
Next cut strips of underlayment to size and lay the strips down across the exposed floor.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.