Normal room temperature and humidity conditions must be maintained for the entire.
How to lay timber flooring on concrete.
By eliminating the paint it ensures that the adhesive is going to stick to your concrete.
Follow these steps with care to safely complete the installation yourself.
Flooring usually takes three to five days to acclimate but the real test of acclimation is when its moisture content as measured by a meter has fallen to within 4 percent of that of the subfloor.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
If you are using an old floor and it has previous paint you ll have no other option but to remove it.
Here are some of our tips for preparing concrete before laying your hardwood timber floor.
Cut pieces as you go.
Always have an exit plan when laying out the floor.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
You don t want be trapped in a corner and have to walk on the newly installed floors.
When you install hardwood floors concrete is one of the best bases to work from there are only a few steps to take.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
Lay down a moisture barrier.
Lay the floor parallel to longest wall in the room.
Whether you re planning on renting out your home or looking to increase its value using concrete as a base is a great idea.
Unpack the flooring and spread it around the room to acclimate.
Moisture can ruin your flooring before you even install it so avoid bringing the flooring into the installation space until the concrete is dry.