Hardwood flooring boards either solid wood flooring or engineered wood flooring can be fitted onto existing wooden floor boards.
How to lay oak flooring on floorboards.
Use an overlay flooring nailer also caller a porta nailer.
Typically old softwood floorboards will be warped and or cupped making the surface irregular and therefore not the best support for your investment.
The results however speak for themselves.
One such area is laying an oak floor over a concrete sub floor.
Installing solid wooden floors onto plywood.
The hardwood flooring should run perpendicular to the existing floor boards to provide maximum strength and stability.
There are basically two options you can consider.
Then install the first row of flooring with the tongue facing away from the wall and fit in place by using the flooring nailer.
Before installing a hardwood floor ensure that the existing wooden floor boards are flat level and dry.
One method to overcome this when laying a solid oak floor would be using the above method of laying out battens.
A floating floor is usually laid over a sub floor or over an existing floor after laying the right underlay.
The first if the existing floor is not too uneven is laying the new solid wood floor over the existing boards at a 90 degree angle.
Glued gluing your floor is often the most popular installation method as it is usually the most simple.
Timber floorboards how to protect your floors we ll show you an easy way to protect your floors from scuff marks damage and stains when you re having work done in or around your home.
Depending on the size of your room it should take around two to three days to lay wood flooring although it has to be said that laying a fixed solid floor is a more time consuming task than installing engineered wood.
03 57 timber floorboards how to sand timber floors learn how to use professional floor sanding equipment to sand a timber floor.
To glue a wooden floor a full coverage of flexible wood adhesive must be applied to the sub floor and the boards.