Then you lay it on the floor and work your way down the room.
How to lay a waterproof concrete floor.
When you start the second row the tongue of the first plank in the second row slides into the groove of the first row at a low angle.
Use a regular paintbrush to apply the paint to the floor so that you do not neglect any divots.
Plan to start perpendicular to the longest wall to keep cutting minimal.
Concrete floor waterproofing method 2.
The final step in waterproofing your concrete basement floors is painting them with waterproof paint.
Each package of vinyl plank flooring will have subtle differences in the plank pattern and color so.
Most water coming up through the basement floor is because it has nowhere else to go.
Mix the paint and pour it into the paint tray.
Snap the chalk line over the top of the concrete or moisture barrier between the marks on opposite walls making a cross in the center of the room.
The piece of plank left over from the first row should be used at the beginning of the second row.
You will lay the flooring.
This method of basement floor waterproofing will reduce the height from the floor to ceiling by about 4 1 2 inches but the floor will stay dry.
Using the room measurements you found in the last step divide the room width by the plank width to determine how wide.
Use a roller to even the paint or to apply a second coat.
The new floor will stay completely dry.
Measure and mark the center of all four walls at floor level.
How to install drainage pipe.
The first row of planks is snapped end to end.
Cracks and gaps will attract moisture so sealing them completely is an important step in making sure your floors are entirely waterproofed.
Using a caulk gun and silicone seal fill the seams between the floor and the wall.
This vinyl plank for this space.
Allow to dry for 24 hours.