Place unopened packages of laminate flooring in the room or rooms in which they are to be installed.
How to lay a chipboard floating floor.
Make sure that the screwheads.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels.
Size the foam underlayment and cut it with a utility knife.
Installing the floating floor 1 roll out the foam underlayment in a single layer across the floor.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
Make a line of glue the length.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.
To establish how many sheets you ll need to buy divide your total room area by the size of the board.
Step 3 make your mark.
Don t forget to make a mark on the wall above every floor joist in the room where you ll be laying your chipboard flooring.
Spread flooring adhesive on the particleboard with your flooring trowel.
Start with a small area so you can reach across wet glue without stepping or kneeling in it.
Continue to lay chipboard flooring across the joists for the rest of the floor ensuring the joints along the 600mm edges are staggered always avoid joining on the same joist wherever possible.
Step 1 let the boards acclimate.
Space the screws out every 6 inches across the entire subfloor.