The other option assuming you have access to the open joists from below is to install 2x4 blocking between the joists 24 inches on center.
How to install wooden floor joists.
Make sure you ve got the right amount of flooring for your space.
Wood floor fitting over joists to answer directly to the question yes it is entirely possible to install a hardwood directly on top of the joists.
Face nail each board at the point of every joist and set the nail with a nail set.
In cases where greater open spans are needed framers often use joist hangers which are u shaped hardware pieces that are nailed in to accept hold and support flooring joists.
Engineered wood floors are easy to install and resistant to moisture making them a great alternative to traditional.
Install joist hangers for added strength with a hammer and nails.
Find a metal joist hanger that can support the new joist you re installing.
When possible begin installation from the straightest longest wall and install the flooring perpendicular to the floor joists.
If you can feel some deflection you have two options.
Fit the joist hanger around the joist.
Both solid wood and engineered can be fitted this way.
The rim joist sits vertically on top of the sill plate along the outside of the frame to create a lip for the main floor joists.
Install hardwood floors perpendicular to the floor joists parallel to the longest wall leaving a inch expansion gap around the perimeter.
For most jobs 2 in 5 1 cm x 10 in 25 cm boards are an ideal size.
Once you have done this you can replace or install your floorboards normally confident that you can rely on your joists to hold your floor together.
Make sure the bottom of the joist is sitting on the hanger without any gaps.
Most manufacturers recommend a standard cutting ordering allowance of 5 and a culling allowance up to an additional 10 percent if installed on a.
You ll use the same size lumber to assemble the rim joists as you will for the main floor joists.
Step 5 finishing up.
Then hammer the hanger to the wall with 16d galvanized nails.
Keep joints that line up at least two rows apart.
Repeat the process as many times as necessary to have joists at roughly 16 inch intervals underneath your floor.
Join the ends of the boards over a floor joist where possible avoiding joints that form an h.