The floor box is an outlet box that s in the floor while a poke thru device goes all the way through the floor she says.
How to install poke thru floor box.
Legrand us wire management wiring devices and cable.
Push poke through into core hole until service fitting is flush with floor.
Regardless of capacity or installation this simple concept allows engineers architects and contractors to select just one product line that will provide a uniform look throughout an entire building whether the power data and av are being delivered in the floor or through the floor.
Complete with one piece finish flange and conduit furniture feed poke thru assembly.
Recommended fire rated poke through size power gangs 5 8 exceeds.
Terminate all wiring per local codes.
And 1 1 1 2 in.
For additional security the poke through flange can be anchored into the floor surface using hardware by others.
This can include just about anything including installing an electrical outlet in a concrete floor.
And 1 1 1 2 in.
Or it can be recessed down below the surface of the floor with a secondary cover plate that covers the receptacle.
Both flush in floor boxes and fire rated poke throughs.
Trade size screw plug opening.
Installation locking ring will engage with concrete core hole securing poke through in place.
Often known in the electrical trades as a poke thru or drop in a floor outlet has a specially designed mounting plate that fits virtually flush with the floor surface the outlet receptacle itself is sometimes flush with the floor level as well.
Available in 4 6 8 and 10 configurations evolution series poke thru devices offer a range of capacity options to solve your open space challenges in the most demanding environments.
The answer is a floor outlet.
Finish cover flange provided with 1 3 4 in.
The challenging part of this project isn t the wiring but having to cut through the concrete.
Recommended fire rated poke through size chart to avoid over or under utilizing the capacity of the fire rated poke through first determine how many gangs of power data and av are required for the application.
The floor box is different from a poke thru device in several ways explains kim fledderman marketing manager with carlon cleveland oh.