Store them unopened for approx.
How to install parquet flooring.
Use a belt sander to sand any high areas and or fill any sunken areas with cement leveling compound step 3 replace any damaged areas in the subfloor.
Starting near a wall and laying the tile in a row or starting in the center of the room and laying the tile in a pyramid pattern.
Next is the gluing down of blocks and sanding of the wood down the grain this needs a light touch and great care best to be left to experts.
Fit the first row of a parquet board as a rule laying begins from a wall at the same time the broad gap about 10 mm is left which will be subsequently closed by a plinth.
The same goes for brush laquer finishing though it can be avoided with engineered wood as its pre sanded and pre finshed editions save you that extra cost to install parquet flooring.
The room temperature must be approx.
Step 1 clean the subfloor.
This guide will show you the basic steps to follow when installing parquet flooring tile using the row method.
Be sure the subfloor is completely dry before beginning to install the parquet flooring step 2 level the subfloor.
When installing parquet wood flooring tile there are two commonly used methods.
20 c at least 15 c and the relative humidity must be approx.
The parquet flooring must acclimatise before laying.
The styles and types of block and parquet flooring as well as the recommended procedures for application vary somewhat among manufacturers.
To prepare the floor for parquet flooring installation you have to add premixed floor leveller which should level it automatically.
At the same time the following installation method is carried out.
The parquet board is established over a substrate by the locking connection of parquet strips.
The subfloor needs to be smooth and level to ensure the overlaid parquet floor is level.