Alternatively screw rows of treated 1x4s to the concrete 16 in.
How to install nail down hardwood floors on concrete.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
Treated plywood to the concrete with concrete screws spaced every 16 in.
To begin stagger panel joints and use 1 8 spacers between panels.
It s best to use shorter cleats than you would for a wood floor to ensure they sink in all the way.
It follows the same method as staple down installation but you use a wood flooring cleat rather than a stapler.
Solid hardwood flooring only can be installed on or above ground level with a plywood subfloor.
Used when installing solid hardwood nail down installation is chosen due to how quickly and cost effectively it can be done.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
Gluing works well when you are installing engineered hardwood over a concrete subfloor but be sure you clearly understand the manufacturer s application instructions before you glue that floor.
Installing hardwood flooring on a plywood covered slab is identical to installing it on a wood subfloor.
Get a comprehensive breakdown on which materials to use what to take into consideration and what steps to take for four subfloor systems.
Floated subfloor alternate subfloor glue down sub floor and the nail down subfloor system.
Learn how to install beautiful hardwood floors over a concrete slab.
Other products are better suited for a nail down installation where they are secured to a wood subfloor with nails or staples.
If you re installing engineered hardwood floors please refer to the staple down instructions.
Here s how to install flooring using the nail down method.
Old basement slabs can crack and buckle in places.
How to install a nail down subfloor over concrete.
Plywood subfloor panels of 5 8 thickness or higher are recommended.
Always check with the manufacturer s instructions to determine if your hardwood floor can be installed over an in floor radiant heat system.
You need to fill any large cracks and be sure that the entire floor is level.
Nail installation is a method commonly used for solid hardwood floors.
Then nail the flooring planks with a standard flooring nailer see photo for details.
Plan to nail down the engineered hardwood flooring when you have a wood subfloor.
Engineered flooring can be installed above grade at grade and below grade level do not install hardwood flooring in bathrooms.
As with other installation methods a moisture control vapor retarder is recommended for on grade and below grade nail down installations.
Align the first board with the layout line with the tongue facing into the room.