Snap the chalk line leaving a straight chalk mark on the subfloor.
How to install laminate wood flooring and keep it straight.
Lay out the unopened boxes of laminate planks in the room.
Lining the flooring up based on the angle of the wall can cause big.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
If the wall is too long to snap the chalk easily kneel by the midpoint of the line and press it down to the floor with one hand.
This will allow them to acclimate to the room s temperature and humidity.
How to install laminate flooring.
The solution is to angle cut the lengths of the first and last courses for your laminate floor layout pattern so the floor is straight even if the walls aren t.
They should acclimate for at least 48 hours.
Mark the expansion gap use your chalk snapline to make a line 1 4 inch out from the starting wall.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
Install baseboards and molding remove the spacers around the border and install baseboards and quarter round molding covering the plastic moisture barrier on the wall and the gap between the wall and the flooring.