You put the tongue of the piece of laminate into the groove and tap the other side of the block with a hammer thereby applying force without mangling the tongue.
How to install laminate flooring for dummies.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels.
This will allow them to acclimate to the room s temperature and humidity.
They should acclimate for at least 48 hours.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
Lay a loose plank of your new flooring upside down against the door casing over a piece of the underlayment and saw off the bottom of the casing.
Place unopened packages of laminate flooring in the room or rooms in which they are to be installed.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
I don t know if there s a name for that tool but i would think any place that sells laminate flooring ought to have them and should be able to offer you some tips.
Fill any low spots in the underlayment greater than 3 8 inch with floor leveling compound.
Step 1 let the boards acclimate.