Repeat until the entire space is covered.
How to install laminate floor on concrete basement.
Start installing laminate flooring by matching their tongue with the groove.
It is one of the cheapest solutions and at the time of writing it could set you back just a few hundred bucks depending on the size of the area you are covering.
Get the installation professionally done so that floorboards are cut to precisely each corner.
Cut plastic garbage bags into squares and then tape them to the floor in various places around the basement.
This will help to acclimate the flooring to the room temperatures and humidity.
Safety gear like goggles face masks and gloves should be worn while installing laminate flooring.
Stagger the seams so there is no clear break line.
Remove any carpet or other flooring.
Lay in place and tap with a rubber mallet to position flooring against one wall.
If your concrete passes the moisture test then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
Connect several laminate floor planks using the tongue and groove pattern on the material.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
If you have some experience with installing flooring or are diy hobbyist it shouldn t take you more than a day to install vinyl plank flooring on concrete.
Add about 10 to that number to account for any possible mistakes and warped boards.
Determine how much flooring and materials will be needed.
Measure the basement accurately so that flooring fits well.
At the end of that time lift the squares to see if moisture has accumulated on the bottom of the plastic.
Multiply length times width of the room.
Apply firm pressure when pushing the planks together.
If it has your basement may be too moist for a laminate flooring installation.
Then leave them for three days.
Where plastic sheets must be joined overlap the sheets by several inches and use strong vinyl tape to secure them.
Here s a tutorial on how to install laminate flooring.
Leave the flooring in the room for three days before installation.
Install a plastic vapor barrier.