Grade levels where moisture conditions do not exist.
How to install 3 4 hardwood flooring.
It provides detailed instructions for installing hardwood flooring over a wood substructure.
Make sure you have a sturdy subfloor.
As a rule of thumb the floor boards you install should cross perpendicular to the joists under the sub floor.
If the sub floor above is more than 1 inch thick this rule can be bent in many.
It is the responsibility of the installer and owner to ensure that job site.
Remove shoe molding from the room and sweep and clean thoroughly.
At the bottom we provide links to posts on the tools we use and frequently recommend for hardwood.
It should be level and free from rot and other major defects.
They are available in 3 4 inch thickness as well as low profile styles that are 5 16 to 5 8 inch thick which are a good or installing over existing flooring.
Minimum requirements are a 3 4 plywood sub floor.
On the last row cut the pieces to fit measuring the distance from the wall to the board not the tongue minus the expansion gap.
3 4 inch cdx plywood is preferred and 3 4 inch osb is acceptable.
Finish hardwood floor installation when you get to the last few rows switch back to nailing by hand.
Most engineered flooring can be installed using staples full spread adhesive or a floating method over an approved subfloor.
We continuously make technological advancements that improve product installer owner responsibility.
Check your sub floor condition.
You may need to use leveling compound to even your surface.
We first ran this article in 2010.
3 4 solid hardwood flooring installation instructions.
If there s a squeak screw a long drywall screw into the sub floor and joist where the squeak occurs.
Make sure there are no squeaks in the floor.
Like unfinished hardwood floors the prefinished types typically have tongue and groove edges on all sides.