With the frame rails split apart it allowed us access to the backside of the frame rail and repair the frame properly.
How to install 1934 floor on frame.
To install standard metal bridging brace the pointed ends of the bars against the joists then nail down the open ends.
To install a door jamb start by measuring the door frame and cutting the wood to size.
Today we are finally going to be welding the body and sub rails together.
Pick a wall to start installing the floor sheeting from typically you will start at the same end that you laid out the floor joists from so you can start with a full or half sheet.
Install bridging on either end of the joists at a distance of of their total span.
So we cut it out and it was repaired.
Next add glue to the end of 1 of your longer pieces of wood and attach a shorter piece to it.
There were a few areas on the frame that had been poorly repaired and this area was obviously cut out at onetime in its past lives for installation of duel exhaust.
If your floors are 15 feet 4 6 m long for example you would position a brace 5 feet 1 5 m from either end.
Installing a pre hung door is easier and faster than starting from scratch since most of the more labor intensive work is already done.
Osb floor sheeting is typically 3 4 thick and comes with a tounge and goove to give the spans between the floor joists strength.
It feels like i have been talking about this step for weeks on end but its finally.