The method used in typical 2 by 8 floor joist construction will insure proper support for the floor joists.
How to hang floor joists on concrete block wall.
The exact number of floor joists you ll need will depend on the size of the floor.
The most common means of securing floor joists to a concrete wall is to install a ledger board that matches the joist size.
You can borrow mine.
Install it flat on the slab surface with the outside edge aligned against the side wall or the edge of the floor line.
The most common method involves attaching a wooden ledger board usually a 2 10 or 2 12 to the wall and then using steel joist hangers.
Then grab your tall dark and handsome son don t have one.
And have him stand on a chair or more safely.
These will be the end sill plates that support the ends of the floor joists.
The primary components are ledgers also.
With most concrete block construction blocks comprise the outer walls of a house and floor joists for the main and upper floor attach between the walls.
Keep in mind that my basement is unfinished so the ceiling of the basement is the floor joists.
Sometimes the design of a home s floor structure calls for attaching floor joists to a concrete block wall.
For applications where the floor joists run parallel to the concrete block wall the floor joist that runs adjacent to the wall can be installed in the same manner as the ledger beam using concrete anchors.
When this is the case the floor joist against the block wall should be pressure treated wood.
Use a steel joist hanger that anchors directly to the concrete core of the wall.
Joists sit horizontally on edge on cinder block crawl space foundations or basement walls to support the floors of a home.
Secure each length to the slab with concrete nails spaced approximately 32 inches apart and 8 to 12 inches from each end.
You can use engineered i beam trusses as joists or choose to use 2 by 12.