Wood siding stucco vinyl brick.
How much distance from siding to dirt.
If the adjacent ground is concrete such as part of a patio or a sidewalk it still requires the same clearance as bare earth.
The concrete and the dirt bed slowly rise a few inches from the front of the house to the back of the house.
Leave a 1 2 gap from the top of the edging to keep mulch from touching the siding.
6.
The recommended clearance of masonry siding products brick stone etc is 6 inches.
Also the exposed foundation makes insect activity termites ants etc much easier to detect.
All siding should ideally have at least 6 to 8 inches clearance above the ground.
Any water that seeps between the concrete and siding will most definitely cause damage.
Install the drip edge one foot from the siding when controlling a grade and a little outside the drip line of a home when controlling splashing water.
Wood products need to be able to dry thoroughly after rain and the extra space aids that process.
Jprettol jon prettol february 2 2006 3 04am 12 the normal code required clearance for exterior siding or stucco at a conrete patio or tile is 2.
However most code inspectors in our area will allow as little as 1.
There s about 3 dirt bed with plants between the walkway and the house.
Wood siding clearance is recommended to be 8 inches from soil.
The dirt should never touch the siding a minimum of 2 of concrete between dirt and siding.
Minimum distance between siding and grade a concrete walkway runs around my house front to side to backyard.
The grade should be at least eight inches between the ground and the first siding row no matter what type of exterior siding we are talking about.
If your grade is level with the siding install a drip edge level with the mulch.
Any clearance is better than none.
Wood siding stucco vinyl brick all siding should ideally have at least 6 to 8 inches clearance above the ground.
That would vary with the installation but siding should pretty much never finish at the patio surface there should always be a gap and that will vary from 2 6 depending on the type of patio materials.
My clients agent has added it as a contigency but the builder is argueing that it is not a code requirement and that i need to provide proof.